newhome Our New House Progress Photo's Front Elevation Laura on the new house lot. Layout of the footers for the new house Garage Footer - Ken in the background Foundation Walls Foundation Walls Lumber Delivered Garage Floor Poured Basement Floor Poured Garage and subfloor Front porch and subfloor Subfloor Walk out basement Stairs in Basement Walk out basement Stairs and bathroom Front porch and right side Front Garage and left side Master Bath framing Master bath on left, double slider in the middle and dining room on the right Front bedroom windows 7/15/2025 First Truss going up 7/15/2025 Putting up trusses two at a time 7/15/2025 More trusses going up 7/15/2025 more than half of the trusses are up. 7/15/2025 Crane arrived at 3:30PM and all trusses were set by 5:20PM. Less than 2 hours. 20250719 Front 20250719 Front Door 20250719 Rear 20250719 Kitchen 20250719 Living room & dinning room 20250719 bedroom #2 20250719 bedroom #3 20250719 Stairs going down 20250719 Basement 20250723 Master bath plumbing for vanity 20250723 Guest bath plumbing 20250730 Outside opening man-door installed 20270730 Fireplace Framing 20250730 Kitchen electrical rough in complete. 20250730 Laundry area rearranged 20250730 Utility Area 20250730 TV wall in basement 20250730 Lumber for the rear deck has arrived 20250802 Rear deck under construction 20250806 Ethernet wiring runs complete 20250808 Front porch poured 20250814 Siding 20250814 20250814 20250814 20250814 20250814 Well Drilling 20250814 Well Drilling 20250818 Master Bedroom wall and ceiling 20250818 Master bedroom 20250818 Master bathroom shower 20250818 Living room looking into master bedroom 20250818 Coat closet and HVAC 20250818 Bedroom #2 20250818 Bedroom #3 20250818 Kitchen 20250818 Living room ceiling 20250818 Basement entertainment wall 20250818 Front wall 20250818 Basement back wall 20250818 Basement Power wall 20250818 Garage 20250818 Garage